The modern 102,000 sq ft facility features a dedicated baggage reclaim area, a secure passport control zone, enhanced seating capacity with panoramic views of the runway, multiple new food and drink options, and two new premium passenger lounges.
EDGE led on project, programme and cost management for this logistically demanding project, delivering Phase 1 between September 2023 and June 2025. Ensuring that the airport remained fully operational throughout the delivery of the new terminal extension, EDGE formulated a 15-stage phased delivery strategy – balancing construction targets with the needs of passengers, airlines and on-site staff.
The majority of construction activities were delivered landside to avoid disruption to airside operations. EDGE deployed a specialist team of commercial, programme and project management experts from its Leeds and Nottingham offices, with several of the team basing themselves on site throughout the lifecycle of the project.